3.1.3 MRP
3.3.3.1 Ph.d AWARED
3.3.4
3.3.5
4.1.1. Table
4.1.2. Sports Yoga Cultural activity Infrastructure
4.1.4. Budget Allocation
4.2.1 ILMS
4.2.2 Table
4.2.3 Table
4.2.4 Table
4.2.5 Table
4.2.6 Table
4.3.1. Table
4.3.2. Table
4.3.3 BSNL Speedtest result
4.4.1. Table
4.4.2. Table
7.1.3 Non convention Energy Source
7.1.5 Solid Waste Collection
7.1.6 Rain water Harvesting
7.1.7 B Green Practices
7.17 A Green audit Report
7.19 Differently abled (Divyangjan)
M.Phil. & Ph.D.